Week 5: Project Finance
Learning Goals
- Understand renewable energy project economics including LCOE trends
- Apply project finance modelling techniques (DSCR, IRR analysis)
- Evaluate green infrastructure investments through case studies
Topics Covered
- Levelized Cost of Energy (LCOE)
- Renewable capacity growth trends
- Project finance structures
- DSCR sensitivity analysis
- Cash flow modelling
- IRR sensitivity analysis
What is assessed
The midterm financial modelling project falls after this week and carries 20% of the mark. It asks for a project finance model of a renewable energy asset: a cash flow projection, a debt service coverage ratio through the loan tenor, and an internal rate of return with a sensitivity analysis over the drivers the week identifies. The model is the deliverable, and the marks follow the assumptions a participant states and defends.
A mark of 70% over the four assessed parts earns the certificate, 80% a merit and 90% a distinction. Attendance below 90% of contact hours ends certification whatever the marks.
Materials
- Lecture Slides (PDF), 34 pages
(c) Joerg Osterrieder, University of Twente